
AN OLD DOCK,made safe again.
A dock fails from the water up: the pilings and the framing go before the boards do. Grain & Co. looks at what is under the deck boards before quoting a repair, because new boards on rotten joists fail again.
Grain & Co. re-decks docks, replaces pilings and joists, and rebuilds a dock on its old footprint when repair is past making sense. You get told plainly which of the three your dock needs and what each one costs.
- New decking on a sound frame
- Pilings and joists replaced
- A rebuild on the old footprint
- Repair and rebuild priced separately
QUESTIONS ABOUTdock repair.
Can a boat dock be repaired or does it have to be rebuilt?
Both are real answers and the frame decides which. Loose or rotten boards on sound pilings are a repair. Pilings that have rotted at the waterline or a frame that moves underfoot are a rebuild, and past a point that is cheaper than patching. Grain & Co. looks under the boards before quoting either.
How long does a dock repair take?
Re-decking is the quickest of the three jobs. Replacing pilings or rebuilding takes longer, and a rebuild waits on its permit. You get the dates with the written price.
Does Grain & Co. repair docks in Cape Coral?
Yes. Dock repairs and rebuilds are done across Fort Myers, Cape Coral and Lee County, and down to Naples.
Can the old dock's pilings be reused?
Sometimes. A piling that is solid below the waterline and not leaning can carry a new frame. One that is soft at the waterline cannot, and it comes out. Grain & Co. checks each one before the price is written.
REAL DECKS,photographed on the job.
EVERY JOB,the same way.
WHAT FORT MYERSsays about us.
TELL US ABOUTyour yard.
Send your address and roughly what you want built. We come out, measure, and price the job.



